Description
INSTALLATION FOR 2EA 135” LED WALLS ON DRYWALL WITH STEEL STUDS. INCLUDES SECURING TO WALL - CONNECTING AND TESTING ALL CABINETS, POWER SUPPLIES, MODULES AND NOVA STAR CONTROLLER. EACH WALL REQUIRES 20AMP BREAKER. ELECTRICAL WORK AND CAT CABLE RUNS NOT INCLUDED. APPROX 2-3 DAYS FOR INSTALL.
Product Attachment
Reviews
Support
Need to contact us? Go here